MuTRiG v2 specification discussion

Europe/Zurich
1010676994 (Vidyo)

1010676994

Vidyo

https://vidyoportal.cern.ch/join/UDEI8AZUIWzL
agenda

MuTRiG discussion 13. July 2018


Minutes


Participants: André Schöning, Sandro Bravar, Christoph Grab, Wei Shen, Lukas Gerritzen, Frank Meier


Options for chip:

  • Modify RC filter

  • Introduce a simple additional threshold with a fixed amount (add a second transistor shifted by fixed amount attached to the circuit determining the second threshold). Fully correlated to the second threshold. Not a minor modification to the chip, will take 1-2 months extra, likely not be reachable by November.


November deadline is important.


Decisions for the next version:

  • Implement bug-fixes:

    • synchronous reset

    • data rate for short data format

  • Make some other simple modifications

    • Rearranging pads: analog on top, digital on bottom introducing a clear separation of digital and analog on the chip

    • Power-up reset circuit (will take some time)

    • Diode for temperature measurement

    • Disentangling E and T

  • Postpone third threshold to after first experience in data-taking. This is tentative. Wei will continue simulations until next meeting where we can reconsider.

  • Next meeting: week of 6 August (week 32). Quorum: Sandro and Wei. Wei will send a mail to the list of people in about two weeks.

    • Discuss also option of flip-chipping


There are minutes attached to this event. Show them.
    • 10:00 10:20
      MuTRiG v2 status 20m
      Speaker: Dr Wei Shen (KIP Uni Heidelberg)
      Slides