WLHA Core Team Meeting 1

Europe/Zurich

Notes from meeting:

  • LLRF group inform that it is important to upgrade the SALO system of TWLHA
    • Upgrade cost in the 10s of kCHF
    • current system is partially damaged
    • Important if we want to operate with Beam.
  • Nir to speak with Kurt after meeting to see how to proceed before the racks are assigned.
  • Pressurized air. Need to be pulled to diagnostics screen.
  • Feed-through flange is not suitable for UHV.
There are minutes attached to this event. Show them.
The agenda of this meeting is empty