Andreas:
- facility newsletter will have as a highlight the target fabrication paper --> Michael and Andreas are together writing something for that
- Update on the ids frame from Thomas: Rasvan discussed with James and they agreed that we can have the frame, provided that we send 2 engineers to disassemble and assemble the frame (they want to make sure that it is done properly) --> Idea is one person from Leuven and one from PSI; Stella and Marie will follow up with Sven and the mechanical workshop
Thomas:
- working on ERC periodic report
Stella:
- Pm run: initially: thought that having the reference charge radii measurements would be good, but now notice that the transition they used is not so sensitive to the charge radii; but having the radii might still add something, but without super much motivation
- Pm147 was already a plan at PSI in 2019 (not done because all time was spent on Ra)
- Igor sent nuclear polarization for Renium
Marie:
- Risetime correction is more or less done
- For BEGes: look into what waveform is contributing to the different peaks in the risetime distribution
-
There are minutes attached to this event.
Show them.