FG-2: Proton beamline - TATTOOS # 1

Europe/Zurich
SZ-WBBA/003 public (PSI) ( )

SZ-WBBA/003 public (PSI)

    • 11:00 11:05
      Updates
    • 11:05 11:25
      Review from CAD Layout 20m

      1- Review of components in the tunnel
      2- Review of tunnel variants.

    • 11:25 11:45
      Civil engineering 20m

      Review of civil engineering concerns

    • 11:45 12:00
      Summary, actions and closing 15m

      #

      Action

      Owner

      Due

      Priority

      Status

      A01

      Check space constrains for crane system (for tunnel layout A and C)

      Thomas Rauber

      23.07.2026

      Medium

      Open

      A02

      Once space constrains are more or less defined, sketch the 3D CAD tunnel.

      Corina, Thomas Rauber

      23.07.2026

      Medium

      Open

      A03

      Insert correct magnets in CAD

      Corina

      23.07.2026

      High

      Open

      A04

      Sketch what beam instrumentation is needed, to insert in CAD

      Jochem Snuverink, Corina

      23.07.2026

      Medium

      Open

      A05

      Can we displace the beam 50cm to the left? Can we remove the steel support bar fort that?

      Nils Preiss

      23.07.2026

      Medium

      Open

      A06

      Organize visit SINQ

      Thomas Rauber

      -

      Medium

      Open

      A07

      Once space for crane is defined, can we find a trolley alternative?

      Check Swissfell, CNGS, LEP.

      Johan Wickstrom, Alvaro Romero

       

      Low

      Open

      A08

      Create document for team collaboration of FG-2

      Jochem Snuverink

      23.07.2026

      High

      Open