    • 14:00 14:45
      Round Table 45m

      Reports of work progress

      Speakers: Adrian Herkert (Physikalisches Institut, Uni Heidelberg), Alena Weber (Universität Heidelberg), Andre Schoening (University Heidelberg, Institute of Physiscs), Annie Meneses Gonzalez (PhD Student), Benjamin Weinläder (PI Heidelberg), David Maximilian Immig (Universität Heidelberg), Dohun Kim (Physikalisches Institut University of Heidelberg), Frank Meier Aeschbacher (Universität Heidelberg), Heiko Augustin (PI Uni Heidelberg), Lars Noehte (PI Heidelberg), Luigi Vigani (University of Oxford), Lukas Mandok (Physikalisches Institut Heidelberg), Marius Menzel, Sebastian Dittmeier (Physikalisches Institut, Universität Heidelberg), Sebastian Preuß (PI Uni Heidelberg), Thomas Theodor Rudzki (Physikalisches Institut Heidelberg)

      Attending: Andre, Heiko, Sebastian Dittmeier, Alena, Alex, Annie, Benjamin, David, Dohun, Jan, Konstantin, Sebastian Preuss, Thomas, Luigi/David (connected from PSI), Lennart (joined later), Frank (joined later)

      Minute Taker: Sebastian Preuss

       

      David/Luigi (Testbeam-crew):

      • Checked all powering configurations, works

      • Tested 2 sensors, three more to go

      • Will finish in the given time

      • 2 chips do not work → 4/6 chips working

      Benjamin/Heiko (Run2020 summary):

      • Only one sensor available, three more glued, not yet bonded

      • Delay on inserts

      • Can see data, no AmpOut or Hitbus yet, unable to mask pixels → Heiko and Benjamin looking into it

      • Chips from Optim arrived, one wafer picked yesterday (30.09.2020)

        • Ivan was asked if he needs some of the remaining chips

      • Inserts expected to arrive on friday

      • V5 ready to be tested, but masking would be nice to have (not working yet)

       

      Round table:

      Heiko:

      • Will give prep talk on Monday at 11:00

      Sebastian Dittmeier:

      • Next week, new FEBs will arrive (coils still missing), will be tested, some go to Mainz

      Alena:

      • Designed PCB which arrived yesterday, chips were bonded, will look at firmware

      Alex:

      • Development of FEB for december test ongoing

        • Needs more input for being able to continue

      Benjamin:

      • Work on Run2020 ongoing

      • Waiting for Master thesis result

      David:

      • Testbeam

      Dohun:

      • Fixing grammar and incorporating feedback in thesis

      Jan:

      • Working out how to go to Germany due to COVID

        • Rules at DESY will be updated today

      Konstantin:

      • writing at the moment and continuing some software work

      Lennart:

      • No digital hits, AmpOut, hitbus → Maybe sensor is damaged

      Sebastian:

      • Writing on thesis

      • Some result overview (see presentation)

      Thomas:

      • Organizing transport (see Mattermost for pictures etc.)

      • Glued last letter

      • Will bond second-to-last ladder

      • Will finish outer half shell this week

      • LTU’s HDIs look good in quality, thickness same as before, optical check says they’re good, also under the microscope; connectivity will be tested

        • length matched really well (~20-30 um accuracy)

      Luigi:

      • Testbeam and related work

      Frank:

      • ETH Zurich started tests with longer cables, results expected within next two weeks

        • different driver than the one we use

        • Results needed in order to decide what is needed for a new MuTrig

      • Magnet cooldown still ongoing on PSI

        • coil at ~170K

        • cooldown at expected pace, will take ~10 more days

        • Vibrations of coolers have to be looked into, will probably be investigated further beginning of next year to then determine appropriate dampening solution

      • Working on sensors for the experiment (temperature, humidity, pressure, …)

        • Difficulty due to different interfaces, maybe a change of specification is needed

      • Two new students, one working on helium filling process, one on expansion

      • Design of upstream beampipe at PSI started

       

      Andre:

      • HVMAPS consortium will end mid next year (2021)

      • Will contact some people to write new applications (due 01.11.2020)

    • 14:45 14:55
      AOB