Andreas:
Beamtime in May: setup in W19, run 16/05-18/05
No MB for MIXE beamtime
Leuven detectors: arranging transport (via ISOLDE) most likely the first week of May
Radiochemistry is preparing the Ra target
MOU for Razvan's detectors is almost finished (2x large coax + 1x Tigress clover)
Katharina:
Calibration of the x-ray tube
XRF in a lead castle
Nice and linear, unlike the beamtime
Michael:
Hypermet fitting works nicely on some of the peaks, but initial parameters might not be easy to set
Step and linear background often mess each other up --> Suggestion Frederik: first fit without linear term, add after
Andreas:
Co-56 will be made at PSI rather than at the medical cyclotron at ETH
Frederik:
DAQ tests
Clock offset not found --> perhaps bad cable
One of the struck models seems to have one ADC chip that might not be working well --> During beamtime give an input and check if it is alright