PSYS Upgrade Meeting 2
→
Europe/Zurich
Comments
- installation in October/November
- Accessing the laser lab there’s a separate PILZ system
- Replace the PSYS we have now.
- Suggestion: we’d like to add one mode. This is ‘Laser Mode’. Key panel to enable laser mode.
- Badge monitor to access during ‘Laser Mode’ with the tunnel mode.
- Tony's group to do electrical drawing
- Emmanuel Hüsler for installation.
Actions
- Tom to give Tony a PSP for work.
- Tom and Tony to discuss with Emmanuel.
- Tom and Alex to do Risk Analysis together by Mid-2026. Tom to prepare draft of combined risk analyses.
- Philip Bryan ordered hardware already for Marco Pedrozzi. Tony to ask Philip about hardware.
There are minutes attached to this event.
Show them.
The agenda of this meeting is empty