James:
Delay on drawing approval for box plates-> expected end of week feedback
Target flange next for review
Target door under review, next to order
Ceramics from K.J Lesker, quote expected end of week
Rob House
Florain to release the drawings for chamber- busy with HIMB
Table design to be reviewed for release by us next week, expected costs are 3kchf for structure and 5 for the top
High current contacts are approved and under construction, expected august
Reinhard:
Laser interlocks requires the HSE to know the locations of all the services in the room
PSI have an existing solution for the beam blocker but requires modification to operate with the higher power lasers. Needed for Q3 2027
Expected to purchase multiple lasers, has been reviewing the market for suppliers
Requires a large lockable place to store the laser before construction of the lab
Sven:
Ordering racks for the vacuum and the LabVIEW controls
Using recycled racks to save costs. 1x 600mm and 1 x800mm depth full height racks
Inductive heating system from SINQ that may be of use to TATTOOS. To be seen later
Davide:
Remi away for month and will be running tests in TRIUMF
Pushing to fabricate 10 targets for testing
Workshop is keen to work on this project
Tim:
No updates this week
Group:
Not in favour of AI transcripts, will not be used
There are minutes attached to this event. Show them.
    • Updates on OLT

      Quick update on the schedule, tasks, risks, and news concerning the off_line TATTOOS lab.

      Conveners: James Cruikshank (Paul Scherrer Institute), Stuart Warren (PSI - Paul Scherrer Institut)
    • Summary and ACTIONS