•Rob:
•Drawing for the pumpstand skeleton released. Still a few small pieces to pass the drawing inspection. Working with james to complete
•Davide:
•In contact with Remi regarding the number of targets to test at TRIUMF. Will find out more later
•Reinhard:
•Documenting lasers and working on the certification of the increase load laser blockers.
•Received drawing from Manchester uni for the TISA array
•New shutter documents concept approved working with Eurofins to verify certification
•Sven:
•Controls for pumpstand..
•Domain issues for the labview systems
•Will arrange meeting next week with controls group
•New master student expected in October to produce the controller software
•Stu requested that sven include james into this process as there are more controls for other systems
•James:
•Waiting for answers from workshop for the cooling plate drawings and the bellows
•The ceramic from lesker is 50k for the complete assembly with brazing. But no bellows
•Looking for alternatives