FG-2: Proton beamline - TATTOOS # 2

Europe/Zurich
SZ-WBGB/021

SZ-WBGB/021

    • 1
      CAD layout review

      What to see:

      1. Target building went down, as R.Eichler requested base floor to be at road level. What is the impact of this in costs?
      2. After bending dipole in target building, we do not have space for the machines in the component list. Can we maybe bend the beam more? Are these machines necessary? Or could we maybe delay the bunker to make space for these components?
      3. How much space is good between tunnel and Trafos? Are 4m enough?
      4. Currently, beam-tunnel is 3-m. Is that enough for services? Check with Thomas Raube.
      5. Can we touch the WEHA pilars? How would this change the usage of the SC magnet?
    • 2
      Document Pronton beamline review