Zoom [link] Task tracking: [Mattermost Board]

Key points

  • Wire bonding on new flexes (main issue): Alex has been focused on bond optimisation, as bonds aren’t sticking reliably. Two more ladders were made for testing, one on a V3 HDI and some on V4. Plasma cleaning improved results slightly but less than hoped, and it would need a proper study. Evidence points to some chip contamination: one chip bonds well, the neighbouring chip bonds badly. The new flexes may also play a part, since wider traces (by under 10 microns) seem to need more bonding energy. The window is narrow, because more force makes bonds stick but can smash through the trace.
  • Bonding approach: Increasing bond duration rather than ultrasonic power is the industry-standard first step, and Alex’s interval bonding (varying power during the bond) is working well. He has swapped in a new tool of the same size and will try a larger wedge, as the Oxford group has plenty. Thomas suggested checking whether LTU can supply custom wedges.
  • Possible flex material changes: There is visible cloudiness on the aluminium, possibly oxidation or a thin film of grease. LTU says materials haven’t changed. Thomas suggested checking the basic flex properties, such as layer thicknesses, and asking LTU about their own via-bonding experience.
  • Baking step: Sultan recommended a pre-bond bake, as is standard practice, and suggested asking LTU for their recommendation. 150°C may exceed what Aerodite 2011 is rated for, so Thomas also suggested asking whether a different adhesive could be used long-term.
  • Redundancy of bonds: Most bonds are redundant, but Vhigh and Vlow are not. Generally, the aim is zero failures. The critical bonds have not been a problem since their layer was swapped closer to the chip.
  • LTU communication: Share all LTU correspondence between Oxford and Heidelberg, with Heiko CC’d as he will oversee HD's studies. Post a short summary to the e-log after each email thread with conclusions. Alex will draft an email to LTU this week covering bonding difficulties, material changes, baking and wedge sizing.
  • Production status: The electrical ladder with the new flex is ready to bond once Alex is happy with the parameters. The stiffener tool design can’t start until the profile is finalised, and Adam (Brick Kiln) has no update as he is still fixing an issue. Encapsulation work has been put on hold. Vertex flex production at LTU has no update, though it usually takes 3–4 weeks.
  • Interposer flex designer: Still unresolved. It depends on Daniela’s discussion with management about whether Sultan can do it.
  • Chip QC and probe card (Oxford): The chip testers have started and should have independent access next week. The new probe card has a powering problem: the chip configures and the links look good, but it loses configuration after 10–15 seconds. Sultan saw large voltage drops on the cable and believes the cable and the probe card design (LC filters, high-speed lines) are contributing. The plan is to try the new cables first, and components are already ordered.
  • Module testing at Liverpool: The new module is being checked before testing the newer firmware branch. One downstream ladder shows about 20 ohms on LV, which behaves like a developing short, and it will be disconnected. Upstream has power and sense issues. The new clamp is better but not perfect, so Matt is making a 2 mm version to fix the 1 mm board bowing. Assembly is still fiddly but no longer takes a full day.
  • Matt’s PSI tasks (Monday): Investigate the dodgy HV connections, probe all connections for a post-run functionality map, and check the DABstp positions. Joey will photograph the DABstp positions when the cage is back in the tent, and anyone needing earlier checks must warn the crane team in advance.
  • DABstp connections on cage: The ladders on the detector may be connected out of order downstream, with J11 and J14 effectively swapped. Matt will check at PSI.
  • Other: Joey is finishing one more module before the PSI setup is reprised on Monday, and is following up on the Tuesday integration discussions with Robert.