16–17 Nov 2016
University of Applied Sciences, Brugg/Windisch and Paul Scherrer Institut, Villigen
Europe/Zurich timezone

RF operation at the SLS and status of the SLS2 proposal

17 Nov 2016, 09:15
20m
OSGA/EG06 (Paul Scherrer Institut East)

OSGA/EG06

Paul Scherrer Institut East

Speaker

Dr Lukas Stingelin (Paul Scherrer Institute)

Description

In spring several hours of accumulated down time occurred because of klystron reflected power interlock. A dozen of power glitches caused the LINAC- and storage-ring RF systems to trip. In the LINAC pulse forming network cabinet, a high voltage cable was burnt due to arcing and triggered the fire extinguishing system. Mayor maintenance tasks of this year include and refurbishment of power supplies of the klystron supply units. In summer 2016, the spare cavity was powered by the solid state amplifier and conditioned in the teststand. First tests to operate the booster cavity with the solid state amplifier were successful.The current status of the SLS upgrade proposal is presented with estimates of collective effects.

Primary author

Dr Lukas Stingelin (Paul Scherrer Institute)

Co-author

Presentation materials