Conveners
Session 5: Contributions from MAX-IV and SLS
- Patrick Marchand (Synchrotron SOLEIL)
Dr
Lukas Stingelin
(Paul Scherrer Institute)
17/11/2016, 09:15
Oral presentation
In spring several hours of accumulated down time occurred because of klystron reflected power interlock. A dozen of power glitches caused the LINAC- and storage-ring RF systems to trip. In the LINAC pulse forming network cabinet, a high voltage cable was burnt due to arcing and triggered the fire extinguishing system. Mayor maintenance tasks of this year include and refurbishment of power...
Dr
Marcos Andre Gaspar
(Paul Scherrer Institut)
17/11/2016, 09:35
Oral presentation
We describe the developments of our solid-state power amplifier technology in the Swiss Light Source (PSI). We will discuss about the installation, tests, control system, and test-stand system.
Mr
Aleksandar Mitrovic
(MAX IV Laboratory)
17/11/2016, 09:55
Oral presentation
-MAX IV Overview
-Commissioning and operational status
-Ongoing and future project