Analysis discussion meeting

Europe/Zurich
https://psich.zoom.us/j/64223995890?pwd=b0RJMmdQQytMdnlDOW9wd0YrLy9WUT09

https://psich.zoom.us/j/64223995890?pwd=b0RJMmdQQytMdnlDOW9wd0YrLy9WUT09

Andreas:

Beamtime in May: setup in W19, run 16/05-18/05

No MB for MIXE beamtime

Leuven detectors: arranging transport (via ISOLDE) most likely the first week of May

Radiochemistry is preparing the Ra target

MOU for Razvan's detectors is almost finished (2x large coax + 1x Tigress clover)

 

Katharina:

Calibration of the x-ray tube

XRF in a lead castle

Nice and linear, unlike the beamtime

 

Michael:

Hypermet fitting works nicely on some of the peaks, but initial parameters might not be easy to set

Step and linear background often mess each other up --> Suggestion Frederik: first fit without linear term, add after

 

Andreas:

Co-56 will be made at PSI rather than at the medical cyclotron at ETH

 

Frederik:

DAQ tests

Clock offset not found --> perhaps bad cable

One of the struck models seems to have one ADC chip that might not be working well --> During beamtime give an input and check if it is alright

 

 

There are minutes attached to this event. Show them.
    • 1
      Update hypermet fitting
      Speaker: Michael Heines (KU Leuven)