PSYS Upgrade Meeting 2

Europe/Zurich

Comments

  • installation in October/November
  • Accessing the laser lab there’s a separate PILZ system
  • Replace the PSYS we have now.
  •  Suggestion: we’d like to add one mode. This is ‘Laser Mode’. Key panel to enable laser mode.
  • Badge monitor to access during ‘Laser Mode’ with the tunnel mode.
  • Tony's group to do electrical drawing
  • Emmanuel Hüsler for installation. 

 

Actions

  • Tom to give Tony a PSP for work.
  • Tom and Tony to discuss with Emmanuel.
  • Tom and Alex to do Risk Analysis together by Mid-2026. Tom to prepare draft of combined risk analyses.
  • Philip Bryan ordered hardware already for Marco Pedrozzi. Tony to ask Philip about hardware.

 

There are minutes attached to this event. Show them.
The agenda of this meeting is empty