Pixel Production (VTX+OP)

→ Europe/Zurich
Description

Zoom [link] Task tracking: [Mattermost Board]

Key Points 

  • Proceed with mechanical ladders for bond optimisation rather than forcing through electrical ladder bonding with new HDIs, to avoid ambiguous results
  • Plasma-clean remaining chips on mechanical ladder to test whether contamination is the root cause
  • Stiffener prototype delivery from Adam's team remains delayed.
  • Bond optimisation study on interposer flex completed successfully; new HDR showed no meaningful difference from old
  • Wider traces on Version 5 HDI confirmed effective — no trace breaks observed
  • Vertex HDI review finalised and approved; photo mask briefing initiated with LTU
  • Matt built and installed a new module in the QC box; new clamp design reported to work better
  • Probe card commissioning in progress: contact resistance needles with LED diode logic verified functional 
  • Unencapsulated ladder reached ~3,500 thermal cycles and is beginning to fail (well beyond required cycles), summary to follow
  • Heidelberg cleanroom now clean; equipment being moved back in under controlled conditions 
  • Zurich (UZH) QC setup using VNA to measure V1 uTP cables; infrastructure ready, setup expected online next week (Thomas+student)

Blockers

  • Inconsistent chip bonding (suspected contamination) → Alex to investigate via plasma cleaning before bonding electrical ladder 
  • Stiffener prototypes not yet delivered — Adam's team struggling with flatness and stiffness; timeline uncertain 
  • FPGA communication issue when testing new probe card → Aliki + Mark debugging 
  • Upstream connectivity missing on newly mounted module → Matt to retry when back next week 

Pending Confirmation

  • Whether Sultan will take on interposer flex PCB design work (Oxford internal discussion first) 
  • Carbon fibre DMA mechanical test study not yet done by Todd's team; only re-verified storage condition 
  • New engineering integration meeting proposed for Tuesday's (starting 17 November?), 2 PM UK / 3 PM CET — to be confirmed by Robert
  • Thermal cycling studies of encapsulated bonds on ladder deprioritised until HDI qualification (and bond optimisation) is complete 

Action Items

  • Luigi: Contact supplier to initiate endpiece reorder paperwork 
  • Ashley/Alex: Continue pressing Adam's team on stiffener delivery before Christmas 
  • Matt (on return): Retry upstream connectivity check on newly mounted module in QC box
There are minutes attached to this event. Show them.
    • 11:00 → 11:45
      Status reports 45m
      Speaker: Ashley McDougall (University of Oxford)