ntroduction of new summer student, Frank Hantschel from Heidelberg; he will be with us for three months. Frank's task consists in the integration of BET into the OPAL framework.
Some news on OPAL:
more beamline elements have become available
it is now possible to have several tracking sequences in a row
a first implementation of a 1D CSR model will become available by the end of the week
wake fields should be implemented by the end of the month
The FELSIM cluster is now up and running. Early users are testing it. There are a few minor performance issues. Not all the software is installed yet, in particular the queuing system is still missing. AIT currently suffers from a manpower problem (several people leaving) Of course, OPAL is installed and running!
Discussion:
YK: Would it be possible to include a tool that converts OPAL output to SDDS and vice versa? For instance we could use OPAL up to the bunch compressor, then ELEGANT for the rest.
AA: Suuure, let's sit together and do it.
FS: Is the 1D CSR model in OPAL similar to the one in ELEGANT?
AA: It's the same model. FS: Are drifts included?
AA: Yes, absolutely. In fact, OPAL has an explicit drift element, which is essential for wakefields and CSR calculations.
YK points out that binning is a very important parameter in ELEGANT! AA: You have it in OPAL, it's a parameter you can set YK: We should cross check OPAL with ELEGANT! AA: It will be easy with SDDS - H5Part conversion