Choose timezone
Your profile timezone:
Michael:
Enriched stable potassiumchloride has arrived in Leuven
Emilio hasn't had time for the Ag-110m yet --> Would try to do it next week
Bad news from iThemba --> Problems with the high voltage --> About a month expected before start of K-40 --> Should be enough for the implanted target, but Thomas and Michael are looking into alternatives
Simulations for muons stopping in KCl: Range of about 1mm at 30 MeV/c (for 15mm diameter disk, the thickness of KCl is 1.66mm/100mg)
Looked at IDS clover traces: Seem very nice to work with our timing algorithm --> No problems expected for using clovers
Katharina:
Ascona conference poster
Going through administration for ordering Li
Paperwork for new lithium should be done soon