Conveners
Session 5
- Daniela Leitner
-
Simon Barrière (CERN)06/05/2026, 10:20Oral
The High-Luminosity Large Hadron Collider (HL-LHC) project involves a major upgrade of the cryogenic infrastructure supplying helium to the final focusing regions of the ATLAS and CMS experiments. The integration of new superconducting components requires the complete removal of the existing cryogenic systems installed in the long straight sections at Points 1 and 5, covering a total length of...
Go to contribution page -
Nate Lipkowitz (SLAC)06/05/2026, 10:45Oral
Thispresentation will describe the planning and execution of the LCLS-II-HE long downtime scope for the cable plant and controls/safety systems. Topics will include the safe removal of a portion of the existing facility’s commissioned cable plant (electronics racks, cable trays, and cables); cable plant inventory management, storage and staging; inspections and QA/QC processes; as well as...
Go to contribution page -
Christopher Pontieri (Brookhaven National Laboratory)06/05/2026, 11:10Oral
This presentation outlines the System Installation and Final Integration (SIFI) scope supporting the Accelerator Storage Rings (ASR) Subproject. The focus is on the installation and integration of Electron and Hadron Storage Ring systems within the existing 3.8 km beam line tunnel and the new and existing service buildings at Brookhaven National Laboratory.
The talk details installation...
Go to contribution page -
Evgeny Solodko (PSI - Paul Scherrer Institut)06/05/2026, 11:35Oral
-
Martin Huber06/05/2026, 11:45Oral
-
06/05/2026, 11:55Oral
-
Oral