Andreas:
New 56Co source --> Aim for ~20 kBq in the week of 09/09
Found veto without hole, but some work remains to be done
Arrangements for setup space in the experimental hall --> Andreas will take care of the needed equipment
Action on Ge transport from Munich
Michael:
Input config file for analyzer --> If you don't use it, command stays the same
Old online display still works --> Can do some basic stuff on there, but not perfect
Frederik:
Doing updates on the mux-daq pc
Some issues with the remote server
Will be at PSI next week and the second week of September for mu3e and quartet
Stella:
4 detectors from Leuven still coming --> 3 not in the neutron field from MIXE
One detector with reset preamp, should work with electronics for the SDD
MIXE colleagues are helping us with the sources
War War:
Targets have been prepared
Silicon samples have arrived at PSI
Marie:
New support plate --> Should be ready for Marie and Michael to take it to PSI
Screws for target holder --> Comment Thomas: Take different length screws as tollerance
Target holders have been made
Geant4 stopping depth agrees very well with SRIM
Optimization of array --> Check slides for details