  1. Giovanni Simonetti (Elettra - Sincrotrone Trieste S.C.p.A.)
    05/05/2026, 14:50
    Poster

    The Elettra 2.0 project schedule set tight deadlines in a fast paced technical environment. In this framework, expertise, teamwork and method must be merged all togheter in order to ensure the effectiveness of every installation phase and to guarantee the safety of the operations. Contractors with different levels of specialization are also involed, making the technical coordination...

    Go to contribution page
  2. Mrs Priyanka Gupta (Lawrence Berkeley National Laboratory)
    05/05/2026, 14:55
    Poster

    The LBNL ALS-U project is delivering major facility upgrades to install a new Accumulator Ring (AR) and Storage Ring (SR), requiring cable plant infrastructure to support approximately 10,000 cables in a highly congested and space-constrained environment. This work demands strong coordination between design, AHJ compliance, and field execution to ensure constructability and schedule...

    Go to contribution page
  3. Jean Clifford Brutus (Brookhaven National Laboratory)
    05/05/2026, 15:00
    Poster

    The development of a long-term 2.0 K testing capabilities at Brookhaven National Laboratory (BNL) is essential for the Electron-Ion Collider (EIC). Since the Superconducting Radio Frequency (SRF) cryomodules will be built at Jefferson Lab in Virginia and transported to BNL, a critical need exists for testing at BNL before their installation in the EIC accelerator complex. Testing the...

    Go to contribution page
  4. Davide Avogaro (UNIPD / Elettra / PSI)
    05/05/2026, 15:05
    Poster

    Designing large-scale facilities is inherently multidisciplinary, requiring close collaboration between industrial and civil design domains to ensure structural integrity and system integration. In civil engineering, best practices increasingly rely on Building Information Modeling (BIM), a digital methodology that enables the creation and management of structured, information-rich 3D models...

    Go to contribution page
  5. Fernando Pedrosa (CERN)
    05/05/2026, 15:10
    Poster

    As part of the Physics Beyond Colliders study, CERN will repurpose an underground experimental area (ECN3) in the North Area to explore physics beyond the Standard Model through a new beam dump facility to house the Search for Hidden Particles (SHiP) experiment. The High Intensity ECN3 project aims to upgrade the current infrastructure and implement the systems required to deliver beam to the...

    Go to contribution page
  6. Kurt Bitterli (Paul Scherrer Institut)
    05/05/2026, 15:15
    Poster

    During the Upgrade, Removal and Installation it is very important to have a centralized database for the data on hardware (HW) components, such as, locations, system names, cable numbers, hostnames, MAC addresses and relations between various HW components and several user groups. The centralized database is also used for HW planning and life cycle management, and tracks the history of every...

    Go to contribution page
  7. Pawel Nowak
    05/05/2026, 15:20
    Poster

    The CIRI infrared line is the first beamline designed at NCPS Solaris. This presented many challenges during the design phase. Furthermore, the very limited space available to accommodate five vacuum chambers proved to be a significant challenge.

    Go to contribution page
  8. Jean-Luc REVOL, Jean-Luc Revol
    05/05/2026, 15:25
    Poster

    The European Synchrotron Radiation Facility – Extremely Brilliant Source (ESRF-EBS) upgrade has enabled users, since August 25, 2020, to benefit from the first high-energy fourth-generation storage ring light source. For cost and scheduling considerations, the booster injector was refurbished rather than upgraded. However, the long-term ESRF strategy envisions an upgrade of the injector...

    Go to contribution page
  9. 05/05/2026, 15:30
    Oral
Building timetable...