9–12 May 2012
PSI
Europe/Zurich timezone

Session

Projects and studies

10 May 2012, 11:10
Auditorium (PSI)

Auditorium

PSI

Conveners

Projects and studies

  • Frederic Chautard (CNRS)

Presentation materials

There are no materials yet.

  1. Marco Schippers (Paul Scherrer Institut)
    10/05/2012, 11:10
    Talk
    We propose to upgrade existing proton therapy facilities by adding a Linac, which boosts typical cyclotron beams of 230 or 250 MeV protons to 350 MeV. This energy allows proton radiography of all sites in the patients body (yielding improved dose calculations). Furthermore, the transversal penumbra of a 350 MeV proton is comparable to that of carbon ion beams. This can be used in stereotactic...
    Go to contribution page
  2. Mr Thomas Servais (IBA)
    10/05/2012, 11:35
    Talk
    Since last ECPM, the IBA R&D Accelerator Group delivered several new Cyclotrons developments to customers. In the range of low energy machines, first Cyclone3 and Cyclone11 were studied, built and accepted by their users. Beside this, the Cyclone30 family grew up with a high current version completed on site and a multi-particle machine, the Cyclone 30xp, largely inspired by Cyclone70 and...
    Go to contribution page
  3. Dr Saverio Braccini (Albert Einstein Center for Fundamental Physics, Laboratory for High Energy Physics (LHEP), University of Bern, Sidlerstrasse 5, CH-3012 Bern, Switzerland)
    10/05/2012, 12:00
    Talk
    A new cyclotron laboratory for radioisotope production and multi-disciplinary research in Bern has been constructed and will be fully operational in 2012. A commercial IBA 18 MeV proton cyclotron, equipped with a specifically conceived 6 m long external beam line, ending in a separate bunker, will provide beams for routine 18-F and other PET radioisotope production as well as for novel...
    Go to contribution page
Building timetable...